DSpace
 

KNUSTSpace >
Theses / Dissertations >
College of Architecture and Planning >

Please use this identifier to cite or link to this item: http://hdl.handle.net/123456789/6484

Title: The impact of project risk factors on the selection of public works procurement methods in Ghana: A focus on NCT
Authors: Abdul-Razak, Suleman
Issue Date: 3-Sep-2013
Abstract: The procurement of public works through National Competitive Tendering (NCT) has witnessed a significant improvement and adherence to the provisions of the public procurement Act of Ghana (Act 663). Act 663 mandates all public procurement entities to procure works contracts through NCT as a default method of procurement. However, the choice of a procurement method is a critical decision that must be taken into considerstion in the procurement of infrastructure projects. Projects risks can be mitigated or exacerbated depending on the method of procurement...............................
Description: A thesis submitted to the Department of Building Technology in partial fulfilment of the requirements for the award of Master of Science (MSc) in procurement Management, 2013
URI: http://hdl.handle.net/123456789/6484
Appears in Collections:College of Architecture and Planning

Files in This Item:

File Description SizeFormat
Suleman Abdul Razak.pdf1.66 MBAdobe PDFView/Open

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

Valid XHTML 1.0! DSpace Software Copyright © 2002-2010  Duraspace - Feedback