DSpace
 

KNUSTSpace >
Theses / Dissertations >
College of Architecture and Planning >

Please use this identifier to cite or link to this item: http://hdl.handle.net/123456789/6505

Title: A model for predicting the performance of project managers in the tendering phase in mass house building projects in Ghana
Authors: Korda, David Nartey
Issue Date: 4-Sep-2013
Abstract: Taken into condideration the important role PMs play in execution of projects in general and in particular in the construction industry.It has become imperative to develop a model for assessing the performance of PMs in MHBPs in Ghana. Ahadzie (2007) considered the need for an empirical research into developing a model for predicting the performance of PMs in MHBPS in Ghana, a departure from establish standards and....................
Description: A thesis submitted to the Department of Building Technology, Kwame Nkrumah University of Science and Technology, Kumasi in partial fulfilment of the requirements for the degree of Master of Science, 2013
URI: http://hdl.handle.net/123456789/6505
Appears in Collections:College of Architecture and Planning

Files in This Item:

File Description SizeFormat
david nartey.pdf1.15 MBAdobe PDFView/Open

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

Valid XHTML 1.0! DSpace Software Copyright © 2002-2010  Duraspace - Feedback