The cost- effectiveness of NED providing meters to each tenant in compound houses in northern area

dc.contributor.authorBabereyir, Francis D. S. N.
dc.date.accessioned2012-08-22T03:14:30Z
dc.date.accessioned2023-04-20T23:27:54Z
dc.date.available2012-08-22T03:14:30Z
dc.date.available2023-04-20T23:27:54Z
dc.date.issued2011
dc.descriptionThesis submitted to the Institute Of Distance Learning, Kwame Nkrumah University of Science and Technology in partial fulfillment of the requirements for the degree of Commonwealth Executive Masters of Business Administration, en_US
dc.description.abstractSeparate metering is very dear to tenants of compound houses and a challenge to electricity utilities, particularly the Northern Electricity Department (NED). The study investigated the financial implications of installing meters for individual tenants of compound houses in Northern Area of NED. The study used analysis of variance (ANOVA) model to examine the consumption patterns of compound house accounts over time and from station to station. It was realized that tenants increased their consumption upon provision of separate meters, and that the increase was not as a result of time or place. A community survey was undertaken. The result of the survey on consumption conflicted with that of the ANOVA study. It could be that the respondents were of the view that their consumptions were reduced when they were given separate meters. This was probably based on assumption and not by serious consideration. The effect of the PURC tariff structure on the billing was examined. It was realized that in 58.6% of the sample, the amount was lower when the consumption was shared before calculation of the bill, than when the bill was computed before sharing it among tenants. Cost- benefit analysis revealed that a substantial revenue gain to Northern Area is achieved through separate metering. The net benefit in providing tenants with prepaid meters is higher at GH¢2,813,253.71. The inertia in getting 472,500 meters for this purpose are the capital cost and the fact that the department (NED) will need to take similar measures in other Areas.en_US
dc.description.sponsorshipKNUSTen_US
dc.identifier.urihttps://ir.knust.edu.gh/handle/123456789/4477
dc.language.isoesen_US
dc.titleThe cost- effectiveness of NED providing meters to each tenant in compound houses in northern areaen_US
dc.typeThesisen_US
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Babereyir Francis.pdf
Size:
1.2 MB
Format:
Adobe Portable Document Format
Description:
Full Thesis
License bundle
Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.73 KB
Format:
Item-specific license agreed to upon submission
Description:
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: